Go now
Hardly any wait before the tunnel.
- Queue
- no queue
- Wait
- –
- Trend
- stable
Updated just now · Datenquelle: Verkehrsdaten-Plattform (VDP) ASTRA
Share your location during this trip. You see when you will reach the tunnel and how you are progressing. We never store coordinates, only your progress along the route. The trip ends after the tunnel or when you stop it.
- Queue
- 5 min
- %
- Ahead of you
Please do not operate while driving – the display updates itself.
Phone alert
With the Pass
Gotthard Pilot notifies you when the wait drops or the recommendation changes.
See the PassAlong the route
- 28.2 km Exit 36 Altdorf
- 23.0 km Gotthard Raststätte (Erstfeld)Toilet · Food · Shop · Fuel · EV charging · Children · Camper
- 21.8 km Exit 37 Erstfeld
- 14.7 km Rastplatz Grund (Amsteg)Toilet · EV charging
- 13.8 km Exit 38 Amsteg
- 6.8 km Rastplatz GurtnellenToilet · Children · EV charging
- 4.6 km Rastplatz WassenToilet
- 4.0 km Exit 39 Wassen
- 0.8 km Exit 40 Göschenen
- 0.0 km Göschenen portal
AfBN webcams: Wassen Dieden · Gotthardtunnel Nord
Exits: © OpenStreetMap contributors (ODbL). Entries follow the published rule of the canton of Uri, they are not reported. Road signs on site apply.
Tunnel, pass or A13?
- Through the tunnel 16–16 min Göschenen–Airolo including the wait before the portal
- Over the pass closed Extended Göschenen exit, then via Andermatt
- Via the A13 (San Bernardino) – Depends on where you start; usually only worth it from Zurich or Chur.
Road signs and instructions on site always take precedence. Gotthard Pilot never suggests shortcuts through villages.
Why this advice?
- No queue reported.
- Tunnel
- open
- Gotthard Pass
- closed for winter
- Weather at the pass
- −3 °C, snowfall expected · Source: MeteoSwiss
- A13 San Bernardino
- no queue
Confidence of the estimate: 80 % · Advice model 2026.10-d42 · estimated from length
Road signs and instructions on site always take precedence. Gotthard Pilot never suggests shortcuts through villages.